Barrel Dolly with Casters
Qingdao Herzhe Tools Manufacturing Co., Ltd. is one of the leading manufacturers and suppliers of barrel dolly with casters in China. With a professional production team, we are able to meet the needs of the majority of our customers. If you're going to buy bulk premium barrel dolly with casters, welcome to get more information from our factory.
Key Features:
Smooth Rolling:
High-quality casters ensure the heavy barrel glides easily across concrete or asphalt.
Universal Fit:
Designed to securely cradle standard-sized drums, preventing them from rolling off.
Low Profile:
Keeps the center of gravity low for enhanced stability during transport.

Product Information and Specifications
- SC0506
|
Load(KG) |
200 |
|
Caster |
3"(Solid) |
|
Body Size(mm) |
619x155 |
|
Own Weight |
7.5 |
- SC0508
|
Load(KG) |
200 |
|
Caster |
3"(Solid) |
|
Body Size(mm) |
418x151.5 |
|
Own Weight |
6 |
- SC0509
|
Load(KG) |
150 |
|
Caster |
2"(Solid) |
|
Body Size(mm) |
434x80 |
|
Own Weight |
1.8 |
- SC0535
|
Load(KG) |
250 |
|
Caster |
3"(Solid) |
|
LxWxH(mm) |
598x157 |
|
Weight(KG) |
9 |
- TC0104
|
Load Capacity(KG) |
200 |
|
Wheel |
3"(Solid) |
|
Body Size(mm) |
625x190 |
|
Container Load |
918pcs/40"GP |
- TC0105
|
Load Capacity(KG) |
400 |
|
Wheel |
4"(Solid) |
|
Body Size(mm) |
620x170 |
|
Container Load |
1458pcs/40"GP |
FAQ
1.What is the production cycle for customized products?
It takes about 60 working days for customized items.
2.What is the delivery cycle?
Delivery will be arranged right after production is finished. The whole lead time depends on shipping distance and carrier schedule.
3.What is the delivery cycle?
Normally it takes 1 hour from our factory to Qingdao Port for domestic delivery, and 10-60 days for sea freight to most overseas destinations.
Hot Tags: barrel dolly with casters, China barrel dolly with casters manufacturers, suppliers, factory
You Might Also Like
Send Inquiry






